Page 72 - Professional EN
P. 72
ICONS’ EXPLANATION
PREPAR ATION APPLIC ATION TREATMENT
Clean and sand Apply Hand
substrate sanding
Number of layers,
Degrease Pressure, Wet hand
sanding
Fluid opening
Machine
Prepare the matt Apply the resin
sanding
Wet machine
Shake Put the matt sanding
Apply in layers Strip the coating
MIXING DRYING INFORMATION
Mixing ratio, Drying time
Potlife 15 min / 20°C Technical Data Sheet
Drying time Close the package,
Mixing ratio
15 - 30 min / 20°C keep closed
Drying time
Potlife Contains isocyanates
30 - 45 min / 20°C
Drying time
Dilute Protect from humidity
60 min / 20°C
Measuring stick Wait between layers Protect from frost
Store in a cool place
Clean the valve
72