Page 5 - NFCC EN
P. 5

cover with  EPOXY  PRIMER  until  6 months



                             72 h/20°C  final hardness,  ready for welding,  ready for applying  epoxy primer  process  with a scotch  brite red  before  application


                             3 h/20°C  tack free time          24 h/20°C  45 min/60°C  +3 h/20°C



                             15÷20 min  flash off  time/20°C   15÷20 min/20°C


                             2÷3 layers                        2 x 80-90%  of the layer,  outer surfaces;  2 x 100%  of the layer,  inner and hard  to reach surfaces


                             1.2÷2.0 bar  Ø 1.4÷1.8 mm         1.7÷2.2 bar,  1.8 mm  Ø



                             DIN 4/20°C,  50÷70 s              max. mixture  pot life:  2 h/20°C


                             stir for 5 min  minimum           DIN 4/20°C,  28÷33 s



                             blowand  degrease with  SILICONE  REMOVER  twice  3+1+20%  100 g+20 g+11 g


                             steel after  sandblasting  or sanded  steel P120



      1                                   2







     5
   1   2   3   4   5   6   7   8   9   10