Page 5 - NFCC EN
P. 5
cover with EPOXY PRIMER until 6 months
72 h/20°C final hardness, ready for welding, ready for applying epoxy primer process with a scotch brite red before application
3 h/20°C tack free time 24 h/20°C 45 min/60°C +3 h/20°C
15÷20 min flash off time/20°C 15÷20 min/20°C
2÷3 layers 2 x 80-90% of the layer, outer surfaces; 2 x 100% of the layer, inner and hard to reach surfaces
1.2÷2.0 bar Ø 1.4÷1.8 mm 1.7÷2.2 bar, 1.8 mm Ø
DIN 4/20°C, 50÷70 s max. mixture pot life: 2 h/20°C
stir for 5 min minimum DIN 4/20°C, 28÷33 s
blowand degrease with SILICONE REMOVER twice 3+1+20% 100 g+20 g+11 g
steel after sandblasting or sanded steel P120
1 2
5